spj tanjung setapa

P202 | Marine Structures

Project Summary

The project involves the development of a comprehensive infrastructure system for SPJ, incorporating both offshore and onshore components designed to support extensive container and berth.

These structures are engineered to accommodate container vessels with a capacity of up to 1,000 (TEU) container vessel and sulphur ships size with a dead weight tonnage (DWT) ranging from 5,000 to 32,000, and a draft of 10.8 meters.

Project Details

design parameters

Project

Package 12B – Provision of Engineering, Procurement, Construction and Commissioning (EPCC) of Solid Product Jetty and Associated Handling Facilities (SPJ) at Tanjung Setapa

project owner

Petronas

Client

PRPC Utilities and Facilities Sdn Bhd

Client's engineer

Technip – Flour Joint Venture Sdn Bhd

Focus

Marine Structures

Location

Tanjung Setapa, Johor

contract period

30 June 2016 -
31 December 2018

contract sum

RM 778,650,000.00