Project Summary
As part of the expansion of Putrajaya Lake’s cruise services, SYS was appointed by Mujur Sepakat Sdn Bhd, under the main contract from Zenith Aim Group, to design and construct jetty works. This project was completed in just four months from February to June 2016. The new jetty serves as a crucial additional drop-off and pick-up point, enhancing the connectivity of the existing cruise services within the lake.
SYS’s scope of work included the construction of a 23-meter pontoon, a 3-meter gangway landing, and a 20-meter aluminum gangway with integrated handrails and rub rails. These modern facilities were designed to ensure seamless passenger movement and improve the overall cruise experience in Putrajaya, contributing to the area’s ongoing development as a premier destination for visitors.
Project Details
- The project involves the design and construction of the following facilities :-
- Pontoon: 23.0 meters x 3.8 meters
- Gangway landing: 3.0 meters x 1.2 meters
- Aluminum Gangway with integrated handrail and rub rail: 20.0 meters x 1.8 meters
Cadangan Membina Sebuah Hotel 5 Bintang 13 Tingkat Berserta Kemudahan Hotel, 2 Tingkat Tempat Letak Kereta dan 1 Tingkat Aras Promenade di Lot 3, (PLOT 2CIB), Putrajaya, Wilayah Persekutuan Putrajaya – Design and Built Jetty Works
Zenith Aim Group
Mujur Sepakat Sdn Bhd
See Yong & Son Construction Sdn Bhd
Marine Structures
Putrajaya, Wilayah Persekutuan Putrajaya
1 February 2016 –
1 June 2016
RM 867,680.00
related
projects
Discover the breadth of our expertise through our diverse range of projects and joint ventures
Useful Links
Plant & Equipments
Contact Us
Headquarters
Unit 2001, Level 20, Tower 1, Faber Towers, Jalan Desa Bahagia, Taman Desa, 58100 Kuala Lumpur, MALAYSIA
Phone: +603 7980 6266
Fax: +603 7980 5199
Plant & Workshop
Lot 2964, 2 ½ Miles, Jalan Minyak Beku, 83000 Batu Pahat, Johor, MALAYSIA
Phone: +607 434 2563
© 2024 See Yong & Son Construction Sdn Bhd | All Rights Reserved.