bintulu samalaju submarine pipeline

P180 | Submarine Pipelines & CWS

Project Summary

SYS was tasked with the procurement, construction, and testing of a marine outfall pipeline for the Tokuyama Malaysia polycrystalline silicon manufacturing plant, located in Samalaju Industrial Park, Bintulu, Sarawak. Chiyoda Malaysia Sdn Bhd, the EPC contractor, engaged SYS for the supply and installation of the wastewater marine outfall pipeline, with engineering oversight provided by Jurutera Jasa (Sarawak) Sdn Bhd.

The project involved the installation of a 1,000-meter onshore and 800-meter offshore HDPE pipeline system. The offshore section ended in diffuser outlets situated at a seabed depth of -3.8 meters, with the entire pipeline being secured with concrete sinkers. The scope included supplying 1,800 meters of 630mm OD PE80 PN12.5 HDPE pipes, and rock trenching up to a maximum depth of 4 meters. Additionally, a navigation light tower was constructed to mark the marine outfall.

Project Details

Project

Project Procurement, Construction & Testing of Marine Outfall Pipeline for Tokuyama Malaysia Polycrystalline Silicon Manufacturing Plant

Client

Chiyoda Malaysia Sdn Bhd

client's engineer

Jurutera Jasa (Sarawak) Sdn Bhd

Focus

Submarine Pipelines & CWS

Location

Samalaju Industrial Park, Bintulu, Sarawak

contract period

July 2011 ~ June 2012

contract sum

RM 14,500,000.00

related
projects

Discover the breadth of our expertise through our diverse range of projects and joint ventures

pekan submarine pipeline
setiu submarine pipeline & Beacon
TANJUNG BIN SUBMARINE PIPELINE