Project Summary
SYS was awarded the contract to excavate and dredge the seabed to create a berthing pocket suitable for load-out barges and vessels with a depth of up to -6.5 meters Chart Datum (CD). The project, managed by Malaysia Marine and Heavy Engineering Sdn Bhd (MMHE), was conducted from November 2013 to June 2014.
The scope of the work involved dredging to the specified levels, with a total dredged volume of 182,320 cubic meters of soil. The dredging operation included the disposal of materials to approved dumping grounds at Ramunia Shoals, located approximately 37NM from the site. During the dredging process, the materials encountered were primarily soft clay, but the operation also uncovered various concrete debris, spun piles, and steel piles. Concrete debris and spun piles were managed using a dredger grab bucket, while underwater divers were employed for cutting and removal of steel piles.
Project Details
- Dredged volume: 182,320m³ of soil up to -6.5m CD
- Dredged materials is of soft clay. Many concrete debris, spun piles and steel piles found during the dredging activity
- Concrete debris and spun piles were grabbed by dredger grab bucket while divers were engaged to do underwater cutting and removal of steel piles
Dredging Works for KBB Topside Loadout at MMHE East Yard
Malaysia Marine and Heavy Engineering Sdn Bhd
Malaysia Marine and Heavy Engineering Sdn Bhd (MMHE)
Dredging & Reclamation
Pasir Gudang, Johor
November 2013 -
June 2014
RM 8,145,743.03
related
projects
Discover the breadth of our expertise through our diverse range of projects and joint ventures
Useful Links
Plant & Equipments
Contact Us
Headquarters
Unit 2001, Level 20, Tower 1, Faber Towers, Jalan Desa Bahagia, Taman Desa, 58100 Kuala Lumpur, MALAYSIA
Phone: +603 7980 6266
Fax: +603 7980 5199
Plant & Workshop
Lot 2964, 2 ½ Miles, Jalan Minyak Beku, 83000 Batu Pahat, Johor, MALAYSIA
Phone: +607 434 2563
© 2024 See Yong & Son Construction Sdn Bhd | All Rights Reserved.