molf

P197 | Marine Structures

Project Summary

As part of the RAPID initiative, Petronas Refinery Petrochemical Corporation Sdn Bhd entrusted SYS with the EPCC of the Material Offloading Facilities (MOLF) Jetty at Teluk Ramunia. The RM 61.5 million project, carried out between September 2014 and September 2015, was crucial for the early preparation of offloading facilities to receive vital materials for the RAPID development. The project involved the construction and upgrading of several key marine structures, including Wharf C1, C2, A, and B, designed to accommodate large cargo operations essential for the refinery and petrochemical expansion.

The scope of work also included extensive dredging to create a 200-meter-wide approach channel, ensuring smooth vessel access, and the construction of new roads, internal drainage systems, and hardstand areas to support the facility’s logistics. The jetty was designed with heavy load capacity to support cranes of up to 250 tons, ensuring the MOLF’s ability to handle high-volume and high-weight materials.

Project Details

DESIGN PARAMETERS

Project

EPCC of Material Offloading Facilities (MOLF) Jetty at Teluk Ramunia for Refinery and Petrochemicals Integrated Development (RAPID) Project

CLIENT

Petronas Refinery Petrochemical Corporation Sdn Bhd

Client's engineer

Technip – Flour Joint Venture Sdn Bhd

Focus

Marine Structures

Location

Teluk Ramunia, Johor

contract period

16 September 2014 –
16 September 2015

contract sum

RM 61,542,208