Project Summary
SYS was appointed as the General Umbrella Contractor for the civil and infrastructure packages of the RAPID Project, under Package 14-SS17, by PRPC Utilities and Facilities Sdn Bhd. This extensive project spanned from October 4, 2017 to October 12, 2019, and involved a broad range of civil and infrastructure works across various components.
Project Details
work order
- WO No.001 - Reinforced Concrete (RC) Works for Sub-Station 839 & Local Control Building 839.
- WO No.003 - Civil Road Crossing Works and STW Sumps at Offsite South West
- WO No.006 - Civil Construction Works for U5510 and 3 nos. Lifting Station
- WO No.012 - Civil Construction Works for Installation of Firewater Valve Pit unit 5510
- WO No.015 - Civil Construction Works for Firewater Valve Pits and Cable Trenching Works at Unit 8835 and 6610
- WO No.019 - Civil Construction Works for RC Duckbank and Cable Pit at Central Laboratory (8310-LLB-801)
- WO No.027 - To Supply of Manpower for Cable Pulling Works at WEST Area under P14
- WO No.028 - Supply and Installation of Offsite Silt Curtain
- WO No.031 - Supply and Install of External Sewerage Line and Steel Works
- WO No.039 - Civil Work, Instrument, Piling and Manpower Services (Surrounding LBB 801, Lot 16A)
- WO No.057 - Remaining Work for HVAC & Water Heater System from Other Package Contractor
- WO No.060 - Construct RC Capping Beam & RC Drain Cover
- WO No.061 - Installation of Piping Works to Hydrocarbon Drum & Electrical Works at Hydrocarbon Pit at Lot 16A
- WO No.062 - Remaining Work for Package 1704 & 1705
- WO No.065 - Additional HVAC Rectification Work
- WO No.070 - Additional Recovery Remaining Works for Knusford Package 1704/1705
- WO No.071 - Supply and Install Fire Seal for Sub 841
- WO No.073 - Supply and Installation of Fire Rated Glass at LBB 801
- WO. No.081 - Permitting Work for Covered Walkway at MGH2
Utilities, Interconnecting and Offsite (UIO) Facilities : Provision of General Umbrella Contractor for Civil & Infrastructure Packages for RAPID Project (Package 14-SS17)
PRPC Utilities and Facilities Sdn Bhd
Building & Infrastructure
Pengerang, Johor
4 October 2017 –
12 October 2019
RM 94,376,797.57
related
projects
Discover the breadth of our expertise through our diverse range of projects and joint ventures
Useful Links
Plant & Equipments
Contact Us
Headquarters
Unit 2001, Level 20, Tower 1, Faber Towers, Jalan Desa Bahagia, Taman Desa, 58100 Kuala Lumpur, MALAYSIA
Phone: +603 7980 6266
Fax: +603 7980 5199
Plant & Workshop
Lot 2964, 2 ½ Miles, Jalan Minyak Beku, 83000 Batu Pahat, Johor, MALAYSIA
Phone: +607 434 2563
© 2024 See Yong & Son Construction Sdn Bhd | All Rights Reserved.