Project Summary
The inspection focused on the intake gates, tunnel, and butterfly valves at 55 meters depth. It was carried out by professional divers and an ROV equipped with sonar scanning to ensure the structures’ functionality and safety
Scope of works
- Underwater Inspection of 2 Intake Gates, Tunnel, and 2 Butterfly Valves at 55m water depth, conducted by:-
- Divers
- Remotely Operated Underwater Vehicle (ROV) equipped with sonar scanning
- Underwater Inspection Report
Pedu Dam Underwater Inspection
MUDA Agriculture Development Authority (MADA)
Marine Structures
Pedu Dam, Kedah
18 May 2021 –
31 July 2021
RM 2,529,249.80
related
projects
Discover the breadth of our expertise through our diverse range of projects and joint ventures
Useful Links
Plant & Equipments
Contact Us
Headquarters
Unit 2001, Level 20, Tower 1, Faber Towers, Jalan Desa Bahagia, Taman Desa, 58100 Kuala Lumpur, MALAYSIA
Phone: +603 7980 6266
Fax: +603 7980 5199
Plant & Workshop
Lot 2964, 2 ½ Miles, Jalan Minyak Beku, 83000 Batu Pahat, Johor, MALAYSIA
Phone: +607 434 2563
© 2024 See Yong & Son Construction Sdn Bhd | All Rights Reserved.