Project Summary
The Kuala Lumpur Flood Mitigation Project, focused on enhancing the Kerayong River’s capacity and profile over a stretch of 1.8 kilometers. This stretch extends from the confluence of the Kerayong River and the Kelang River to the discharge point of the SMART Project in the Federal Territory of Kuala Lumpur. The contract for this project was valued at RM165,097,673.93 and was executed over a period of 50 months, from June 2006 to July 2010.
The primary aim of this initiative was to upgrade the river’s channel capacity and modify its bed profile to improve the river’s ability to support the SMART Project’s flood management systems. To address this, SYS undertook and completed various works under Emergency Works and Interim Award packages before the full Design & Build Contract was awarded.
The project required substantial special temporary works, approximately 25,000 tonnes of materials. It also involved cantilever contiguous bore piles of 1.2 meters in diameter totaling 21,281 meters in length and 1.0 meters in diameter totaling 5,678 meters in length. Additionally, 2,744 soil nails were installed, ranging from 10 meters to a maximum of 21 meters in length. A skin wall was constructed along the river at the water level, extending 900 meters on each side.
Project Details
major quantities
- Special temporary works: 25,000 tonne (approx.)
-
Cantilever contiguous borepiles:
i. 1.2mØ = 21,281m (total length)
ii. 1.0mØ = 5,678m (total length) - Soil nails 2,744 (nos) ranges from 10m to longest 21m
- Skin wall constructed at river water level: 900m both side
machineries involved
- 7 boring machines (peak time)
- 15 crawler cranes (peak time)
- 10 excavators (peak time)
Kuala Lumpur Flood Mitigation Project: Design, Build & Complete River Improvement Works for 1.8km of Kerayong River from the Confluence of Kerayong River and Kelang River to the Discharge Point of SMART Project in Federal Territory of Kuala Lumpur.
Jabatan Pengaliran dan Saliran (JPS)
Kumpulan Sekata Sdn Bhd (KSSS)
Sepakat Setia Perunding
Drainage & Irrigation
Kuala Lumpur
June 2006 - July 2010
RM 165,097,673.93
related
projects
Discover the breadth of our expertise through our diverse range of projects and joint ventures
Useful Links
Plant & Equipments
Contact Us
Headquarters
Unit 2001, Level 20, Tower 1, Faber Towers, Jalan Desa Bahagia, Taman Desa, 58100 Kuala Lumpur, MALAYSIA
Phone: +603 7980 6266
Fax: +603 7980 5199
Plant & Workshop
Lot 2964, 2 ½ Miles, Jalan Minyak Beku, 83000 Batu Pahat, Johor, MALAYSIA
Phone: +607 434 2563
© 2024 See Yong & Son Construction Sdn Bhd | All Rights Reserved.