vale main jetty

P181 | Marine Structures

Project Summary

SYS, in partnership with BMS-JV, has secured a 20% share of the contract for the design and construction of marine works for Vale Manufacturing Malaysia. This project is part of Vale SA’s Regional Distribution Center in Perak, which will handle 30 million tonnes of iron ore annually.

The design is built to support heavy loads, with a live load of 10–15 kN/m², 85-ton max axle load, and a draft of 25m for the Import Wharf and 21m for the Export Wharf. This large-scale marine infrastructure will significantly enhance iron ore distribution in the region.

Project Details

design parameters

major quantities

Project

Vale Malaysia Manufacturing Project Phase 1A

client

Vale Malaysia Manufacturing Sdn Bhd

Client's Engineer

Murray & Roberts Marine (M) Sdn Bhd

Focus

Marine Structures

Location

Teluk Rubiah, Lumut, Perak

contract period

August 2011 -
January 2014
(Including VO Addition)

contract sum

RM 825,403,673

related
projects

Discover the breadth of our expertise through our diverse range of projects and joint ventures

labuan ferry terminal
vale mhq
mmhe west finger pier