<?xml version="1.0"?>
<oembed><version>1.0</version><provider_name>See Yong &amp; Son Construction - Marine &amp; Civil Engineering Contractor Since 1952</provider_name><provider_url>https://sys.com.my/new</provider_url><author_name>syscomm2</author_name><author_url>https://sys.com.my/new/author/syscomm2/</author_url><title>P206 - Package 14-SS17 General Umbrella - See Yong &amp; Son Construction - Marine &amp; Civil Engineering Contractor Since 1952</title><type>rich</type><width>600</width><height>338</height><html>&lt;blockquote class="wp-embedded-content" data-secret="MRUdZeOwf2"&gt;&lt;a href="https://sys.com.my/new/package-14-ss17-general-umbrella/"&gt;P206 &#x2013; Package 14-SS17 General Umbrella&lt;/a&gt;&lt;/blockquote&gt;&lt;iframe sandbox="allow-scripts" security="restricted" src="https://sys.com.my/new/package-14-ss17-general-umbrella/embed/#?secret=MRUdZeOwf2" width="600" height="338" title="&#x201C;P206 &#x2013; Package 14-SS17 General Umbrella&#x201D; &#x2014; See Yong &amp; Son Construction - Marine &amp; Civil Engineering Contractor Since 1952" data-secret="MRUdZeOwf2" frameborder="0" marginwidth="0" marginheight="0" scrolling="no" class="wp-embedded-content"&gt;&lt;/iframe&gt;&lt;script&gt;
/*! This file is auto-generated */
!function(d,l){"use strict";l.querySelector&amp;&amp;d.addEventListener&amp;&amp;"undefined"!=typeof URL&amp;&amp;(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&amp;&amp;!/[^a-zA-Z0-9]/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret="'+t.secret+'"]'),o=l.querySelectorAll('blockquote[data-secret="'+t.secret+'"]'),c=new RegExp("^https?:$","i"),i=0;i&lt;o.length;i++)o[i].style.display="none";for(i=0;i&lt;a.length;i++)s=a[i],e.source===s.contentWindow&amp;&amp;(s.removeAttribute("style"),"height"===t.message?(1e3&lt;(r=parseInt(t.value,10))?r=1e3:~~r&lt;200&amp;&amp;(r=200),s.height=r):"link"===t.message&amp;&amp;(r=new URL(s.getAttribute("src")),n=new URL(t.value),c.test(n.protocol))&amp;&amp;n.host===r.host&amp;&amp;l.activeElement===s&amp;&amp;(d.top.location.href=t.value))}},d.addEventListener("message",d.wp.receiveEmbedMessage,!1),l.addEventListener("DOMContentLoaded",function(){for(var e,t,s=l.querySelectorAll("iframe.wp-embedded-content"),r=0;r&lt;s.length;r++)(t=(e=s[r]).getAttribute("data-secret"))||(t=Math.random().toString(36).substring(2,12),e.src+="#?secret="+t,e.setAttribute("data-secret",t)),e.contentWindow.postMessage({message:"ready",secret:t},"*")},!1)))}(window,document);
//# sourceURL=https://sys.com.my/new/wp-includes/js/wp-embed.min.js
&lt;/script&gt;
</html><description>package 14-ss17general umbrella P206 | Building &amp; Infrastructure Completed Projects Project Summary SYS was appointed as the General Umbrella Contractor for the civil and infrastructure packages of the RAPID Project, under Package 14-SS17, by PRPC Utilities and Facilities Sdn Bhd. This extensive project spanned from October 4, 2017 to October 12, 2019, and involved a broad range of civil and infrastructure works across various components. Project Details work order WO No.001 &#x2013; Reinforced Concrete (RC) Works for Sub-Station 839 &amp; Local Control Building 839. WO No.003 &#x2013; Civil Road Crossing Works and STW Sumps at Offsite South West WO No.006 &#x2013; Civil Construction Works for U5510 and 3 nos. Lifting Station WO No.012 &#x2013; Civil Construction Works for Installation of Firewater Valve Pit unit 5510 WO No.015 &#x2013; Civil Construction Works for Firewater Valve Pits and Cable Trenching Works at Unit 8835 and 6610 WO No.019 &#x2013; Civil Construction Works for RC Duckbank and Cable Pit at Central Laboratory (8310-LLB-801) WO No.027 &#x2013; To Supply of Manpower for Cable Pulling Works at WEST Area under P14 WO No.028 &#x2013; Supply and Installation of Offsite Silt Curtain WO No.031 &#x2013; Supply and Install of External Sewerage Line and Steel Works WO No.039 &#x2013; Civil Work, Instrument, Piling and Manpower Services (Surrounding LBB 801, Lot 16A) WO No.057 &#x2013; Remaining Work for HVAC &amp; Water Heater System from Other Package Contractor WO No.060 &#x2013; Construct RC Capping Beam &amp; RC Drain Cover WO No.061 &#x2013; Installation of Piping Works to Hydrocarbon Drum &amp; Electrical Works at Hydrocarbon Pit at Lot 16A WO No.062 &#x2013; Remaining Work for Package 1704 &amp; 1705 WO No.065 &#x2013; Additional HVAC Rectification Work WO No.070 &#x2013; Additional Recovery Remaining Works for Knusford Package 1704/1705 WO No.071 &#x2013; Supply and Install Fire Seal for Sub 841 WO No.073 &#x2013; Supply and Installation of Fire Rated Glass at LBB 801 WO. No.081 &#x2013; Permitting Work for Covered Walkway at MGH2 Project Utilities, Interconnecting and Offsite (UIO) Facilities : Provision of General Umbrella Contractor for Civil &amp; Infrastructure Packages for RAPID Project (Package 14-SS17) Client PRPC Utilities and Facilities Sdn Bhd Focus Building &amp; Infrastructure Location Pengerang, Johor contract period 4 October 2017 &#x2013; 12 October 2019 contract sum RM 94,376,797.57 DOWNLOAD FACTSHEET related projects Discover the breadth of our expertise through our diverse range of projects and joint ventures warehouse subang hi-tech warehouse shah alam Nestl&#xE9; bintang</description><thumbnail_url>https://sys.com.my/new/wp-content/uploads/elementor/thumbs/IMG_1545-scaled-e1726293672869-qu3060x64c5iq41kwyp0dfkamd8hx318q4d22v4xfw.jpg</thumbnail_url></oembed>
