{"version":"1.0","provider_name":"See Yong &amp; Son Construction - Marine &amp; Civil Engineering Contractor Since 1952","provider_url":"https:\/\/sys.com.my\/new","author_name":"syscomm2","author_url":"https:\/\/sys.com.my\/new\/author\/syscomm2\/","title":"P141 - Jimah Coal Jetty - See Yong &amp; Son Construction - Marine &amp; Civil Engineering Contractor Since 1952","type":"rich","width":600,"height":338,"html":"<blockquote class=\"wp-embedded-content\" data-secret=\"4Mf0HUOl44\"><a href=\"https:\/\/sys.com.my\/new\/jimah-coal-jetty-2\/\">P141 &#8211; Jimah Coal Jetty<\/a><\/blockquote><iframe sandbox=\"allow-scripts\" security=\"restricted\" src=\"https:\/\/sys.com.my\/new\/jimah-coal-jetty-2\/embed\/#?secret=4Mf0HUOl44\" width=\"600\" height=\"338\" title=\"&#8220;P141 &#8211; Jimah Coal Jetty&#8221; &#8212; See Yong &amp; Son Construction - Marine &amp; Civil Engineering Contractor Since 1952\" data-secret=\"4Mf0HUOl44\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\" class=\"wp-embedded-content\"><\/iframe><script>\n\/*! This file is auto-generated *\/\n!function(d,l){\"use strict\";l.querySelector&&d.addEventListener&&\"undefined\"!=typeof URL&&(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&&!\/[^a-zA-Z0-9]\/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret=\"'+t.secret+'\"]'),o=l.querySelectorAll('blockquote[data-secret=\"'+t.secret+'\"]'),c=new RegExp(\"^https?:$\",\"i\"),i=0;i<o.length;i++)o[i].style.display=\"none\";for(i=0;i<a.length;i++)s=a[i],e.source===s.contentWindow&&(s.removeAttribute(\"style\"),\"height\"===t.message?(1e3<(r=parseInt(t.value,10))?r=1e3:~~r<200&&(r=200),s.height=r):\"link\"===t.message&&(r=new URL(s.getAttribute(\"src\")),n=new URL(t.value),c.test(n.protocol))&&n.host===r.host&&l.activeElement===s&&(d.top.location.href=t.value))}},d.addEventListener(\"message\",d.wp.receiveEmbedMessage,!1),l.addEventListener(\"DOMContentLoaded\",function(){for(var e,t,s=l.querySelectorAll(\"iframe.wp-embedded-content\"),r=0;r<s.length;r++)(t=(e=s[r]).getAttribute(\"data-secret\"))||(t=Math.random().toString(36).substring(2,12),e.src+=\"#?secret=\"+t,e.setAttribute(\"data-secret\",t)),e.contentWindow.postMessage({message:\"ready\",secret:t},\"*\")},!1)))}(window,document);\n\/\/# sourceURL=https:\/\/sys.com.my\/new\/wp-includes\/js\/wp-embed.min.js\n<\/script>\n","description":"Jimah Coal Jetty P141 | Marine Structures Completed Projects Project Summary SYS, in a joint venture with HRA Teguh Sdn Bhd, was engaged by Taisei Corporation to construct the Coal Unloading Jetty and Temporary Jetty for the 2x700MW coal-fired power station at Jimah, Port Dickson. With a contract value of RM 31.98 million, the project spanned from October 2005 to February 2008, providing vital marine facilities for the power station owned by Jimah Energy Ventures. This project formed an essential part of the civil works package awarded to Taisei by the EPC contractors Sumitomo &amp; Sumi-Power Consortium. The scope involved the supply and installation of concrete spun piles for both the Coal Unloading Jetty, which consisted of a 1,300-meter trestle and a 300-meter jetty head, and the Temporary Jetty. Over 500 diameter piles and 17,200 cubic meters of concrete were used for the substructure. SYS was also responsible for dredging works under a separate contract, removing over 930,000m\u00b3 of seabed material to facilitate cooling water intake, the temporary jetty, and coal jetty operations, making the project a critical component in supporting the power station\u2019s long-term functionality. Project Details coal unloading jetty Trestle: 1,300m x 13m Jetty Head: 300m x 26m 900 ~ 1,000mm OD concrete piles x 503 pts Concrete: 17,200m\u00b3 Rebar 3,860MT temporary jetty Deck: 70mL x 33mW Trestle: 62mL x 10mW 600 ~ 700mm OD concrete piles x 122 pts Project Construction of Coal Unloading Jetty &amp; Temporary Jetty for the 2x700MW Coal Fired Power Station project owner Jimah Energy Ventures Client Taisei Corporation jv partner HRA Teguh Sdn Bhd Focus Marine Structures Location Lukut, Mukim Jimah, Port Dickson, Negeri Sembilan contract period October 2005 &#8211; Febuary 2008 contract sum RM 31,977,705.00 DOWNLOAD FACTSHEET related projects Discover the breadth of our expertise through our diverse range of projects and joint ventures SPJ Tanjung Setapa Vale main jetty swo &amp; etp rapid","thumbnail_url":"https:\/\/sys.com.my\/new\/wp-content\/uploads\/elementor\/thumbs\/Jimah-Jetty1-scaled-qs55puh4neuomvnk6m9dbdtxidod17750tzflsb424.jpg"}