Project Summary

SYS was engaged by Nestlé Manufacturing (Malaysia) Sdn Bhd for the Bintang Project (Phase 1) in Shah Alam, Selangor. The project involved the construction of a production building with a built-up area of 11,000m², along with comprehensive site rehabilitation and management, focusing on Safety, Health, and Environmental Sustainability.

The project scope included significant civil, structural, and architectural works. Major quantities encompassed 1,000 tonnes of rebar and 7,500m³ of concrete. A 220-meter pipe bridge, 30 Nos steel stairs and landings, and steel fire water tanks (5.8m dia x 9m) were installed. The structural steel roof, weighing 360 tonnes with the longest truss spanning 40m x 17 Nos, was covered with 15,000m² of Colorbond Klip-lok roofing material. 

major quantities

Project

Bintang Project (Phase 1) – Civil, Structural & Architectural Works

Client

Nestlé Manufacturing (Malaysia) Sdn Bhd

client's engineer

Beca PCM Pte Ltd

Focus

Building & Infrastructure

Location

Shah Alam, Selangor

contract period

29 July 2013 –
30 December 2014

contract sum

RM 52,100,000