SYS was awarded the contract for the construction of a steel bridge structure, pile driving, and civil & structural works at the West Finger Pier and Quay 7, MMHE, for the Fas Project in Pasir Gudang, Johor.
The scope included fabricating and installing a 69-meter steel connecting bridge, driving 50 concrete spun piles (1000mm diameter, up to 29 meters in length), and completing extensive civil works. Additionally, the project involved the installation of quay equipment like fenders, capstans, and bollards. The total contract value was RM 8.95 million, and the project ran from 7th November 2022 to 26th July 2023.
Note: Spun piles and reinforcement materials were supplied by MMHE.
scope of work
steel bridge structure
- Steel Connecting Bridge: 69m Length ~ 31,861 KG
- Barrier Access Gate: 354 KG
- Perimeter Guard Rail: 958 KG
- 6mm thick MS Chequered Plate: 360m2
piling driving
- Concrete Spun Piles = 50 Nos (1000mm dia x 23m ~ 29m Length, raked pile 1:4)
civil & structure
- Concrete: 920m3
- Reinforcement: 114,450 KG
- Formwork: 900m2
- Cut-Off Piles: 50 Nos
- Installation of Quay Equipment (Fender, Capstan & Bollard): 17 Nos
Construction of Steel Bridge Structure, Piling Driving and Civil & Structure Works at West Finger Pier & Quay 7, MMHE for Fas Project
Malaysia Marine and Heavy Engineering Sdn Bhd
Cubic Consultancy
Marine Structures
Pasir Gudang, Johor
7 November 2022 -
26 July 2023
RM 8,954,031.56
related
projects
Discover the breadth of our expertise through our diverse range of projects and joint ventures
Useful Links
Plant & Equipments
Contact Us
Headquarters
Unit 2001, Level 20, Tower 1, Faber Towers, Jalan Desa Bahagia, Taman Desa, 58100 Kuala Lumpur, MALAYSIA
Phone: +603 7980 6266
Fax: +603 7980 5199
Plant & Workshop
Lot 2964, 2 ½ Miles, Jalan Minyak Beku, 83000 Batu Pahat, Johor, MALAYSIA
Phone: +607 434 2563
© 2024 See Yong & Son Construction Sdn Bhd | All Rights Reserved.