Project Summary
Kertih Marine Facilities comprise a jetty with six (6) berths, an island breakwater of 1.4m long and coastal protection scheme. The facilities were constructed to provide dedicated marine terminalling infrastructure necessary for the import and export requirements of the petrochemical complex in Kertih.
The project required dredging several areas to specific depths: the Northern Approach and Berth 6 basin to -10 meters, the Southern Approach and Berth 5 Basin to -13 meters, the Multi-Purpose Berth and Marine Supply Craft Berth to -5 meters, and the North of the Jetty to -5 meters.
This was part of the provision of maintenance dredging for Kertih Port Sdn Bhd, managed by East Marine Works Sdn Bhd. The project was focused on dredging and was located in Kertih, Terengganu, running from April 2016 to August 2016.
Project Detail
- The areas dredged are as follows :-
- Northern Approach and Berth 6 basin: -10 meters
- Southern Approach and Berth 5 Basin: -13 meters
- Multi Purpose Berth and Marine Supply Craft Berth: -5 meters
- North of Jetty: -5 meters
Provision of Maintenance Dredging for Kertih Port Sdn Bhd
East Marine Works Sdn Bhd
Kertih Port Sdn Bhd
Dredging & Reclamation
Kertih, Terengganu
April 2016 - August 2016
RM 32,115,514.75
related
projects
Discover the breadth of our expertise through our diverse range of projects and joint ventures
Useful Links
Plant & Equipments
Contact Us
Headquarters
Unit 2001, Level 20, Tower 1, Faber Towers, Jalan Desa Bahagia, Taman Desa, 58100 Kuala Lumpur, MALAYSIA
Phone: +603 7980 6266
Fax: +603 7980 5199
Plant & Workshop
Lot 2964, 2 ½ Miles, Jalan Minyak Beku, 83000 Batu Pahat, Johor, MALAYSIA
Phone: +607 434 2563
© 2024 See Yong & Son Construction Sdn Bhd | All Rights Reserved.