Project Summary
SYS was engaged by Nestlé Manufacturing (Malaysia) Sdn Bhd for the Bintang Project (Phase 1) in Shah Alam, Selangor. The project involved the construction of a production building with a built-up area of 11,000m², along with comprehensive site rehabilitation and management, focusing on Safety, Health, and Environmental Sustainability.
The project scope included significant civil, structural, and architectural works. Major quantities encompassed 1,000 tonnes of rebar and 7,500m³ of concrete. A 220-meter pipe bridge, 30 Nos steel stairs and landings, and steel fire water tanks (5.8m dia x 9m) were installed. The structural steel roof, weighing 360 tonnes with the longest truss spanning 40m x 17 Nos, was covered with 15,000m² of Colorbond Klip-lok roofing material.
major quantities
- Rebar: 1,000 tonne
- Concrete: 7,500m³
- Pipe Bridge: 220m
- Steel Stairs & Landing: 30 Nos
- Steel Fire Water Tank: 5.8m dia x 9m
- Structure Steel Roof: 360 tonne - longest truss 40m x 17 Nos
- Roof Colour Bond Klip-lok (min 0.47mm): 15,000m²
Bintang Project (Phase 1) – Civil, Structural & Architectural Works
Nestlé Manufacturing (Malaysia) Sdn Bhd
Beca PCM Pte Ltd
Building & Infrastructure
Shah Alam, Selangor
29 July 2013 –
30 December 2014
RM 52,100,000
related
projects
Discover the breadth of our expertise through our diverse range of projects and joint ventures
Useful Links
Plant & Equipments
Contact Us
Headquarters
Unit 2001, Level 20, Tower 1, Faber Towers, Jalan Desa Bahagia, Taman Desa, 58100 Kuala Lumpur, MALAYSIA
Phone: +603 7980 6266
Fax: +603 7980 5199
Plant & Workshop
Lot 2964, 2 ½ Miles, Jalan Minyak Beku, 83000 Batu Pahat, Johor, MALAYSIA
Phone: +607 434 2563
© 2024 See Yong & Son Construction Sdn Bhd | All Rights Reserved.