Project Summary
The project site is a mangrove swamp which forms part of a pocket beach in the southern tip of Peninsular Malaysia. When the hinterland of the Sg. Pulai is being developed into various water resources schemes, and construction of port facilities for deep draft vessels is being implemented, the coastline at and surrounding the project site is observed to be eroding at fast rate. Mangroves are falling due to the erosion of the soil underneath them.
JC was engaged by JPS, and JC contracted SYS to address this coastline development phenomena, protects the beach from further erosion and safeguard the mangrove in the National Park with a design and built contract to protect 1.8km mangrove coastline and bakau farm with 1 year of post-construction monitoring.
Project Details
- Design and built to protect 1.8km mangrove coastline and bakau farm with 1 year of post construction monitoring
- A life span of 20 years is adopted in the design of protection work
Design, Construction, and Completion of the Coastal Erosion Control Project
Jabatan Pengaliran dan Saliran (JPS) / Taman Negara Johor
Jetta Construction Sdn Bhd (JC)
O&L Jurutera Perunding
Coastal Protection
Tanjung Piai, Mukim Serkat, Pontian, Johor
November 2009 - December 2010
RM 7,997,880.00
related
projects
Discover the breadth of our expertise through our diverse range of projects and joint ventures
Useful Links
Plant & Equipments
Contact Us
Headquarters
Unit 2001, Level 20, Tower 1, Faber Towers, Jalan Desa Bahagia, Taman Desa, 58100 Kuala Lumpur, MALAYSIA
Phone: +603 7980 6266
Fax: +603 7980 5199
Plant & Workshop
Lot 2964, 2 ½ Miles, Jalan Minyak Beku, 83000 Batu Pahat, Johor, MALAYSIA
Phone: +607 434 2563
© 2024 See Yong & Son Construction Sdn Bhd | All Rights Reserved.